Hydrographic vessel “Albatross”
|

Hydrographic vessel “Albatross”

Solution: Manufacturing and supply of propeller shaft tachometer “TA-12M” consisting of: -Local indication device (PDI) – 2 pcs. Production and delivery of the panel of signal and distinctive lights “SKILINE-M” for 16 lights, with power backup, consisting of: – Power supply and switching unit – 1 piece – Control panel – 1 piece Manufacturing and…
Tug “Nibulon”

Tug “Nibulon”

Task: Automation of control of ship mechanisms Solution: – Supply of a centralized control system – Management and emergency alarms – 3pcs – Start-module. Output of information to adjustment work on the system centralized control Result; The system helped the crew to automate the control of the ship’s mechanisms
Ferry “Wrango”
|

Ferry “Wrango”

A task: Mechanism control automation Solution: Our new automation system has been installed: – APS system – Measurements of levels in ballast and other tanks with information output to the operator panel – Installation of navigation lights – Control of ballast drives Result: The goal has been achieved. The work of controlling the mechanisms of…
Chemical tanker “Sichem Mumbai”
| | |

Chemical tanker “Sichem Mumbai”

Task: Control over fuel consumption for the Main Engine. Installation of a fuel additive dosing system. Problem identified: Non-transparent reporting system for fuel consumption Solution: Installation of a differential fuel consumption control system on the main engine. A fuel additive supply system has been developed and implemented, taking into account the instant fuel consumption. Result:…
Cargo-passenger ferry “STAR”
| |

Cargo-passenger ferry “STAR”

Task: Control and automated accounting of fuel consumption at 4 main engines, 3 diesel generators, 2 boilers. Accounting and control of the consumption of ship energy. Monitoring of bunkering (receiving fuel on the ship). Problem: Increased fuel consumption. Solution: Installation of a differential fuel consumption control system for 4 main, 3 auxiliary engines and 2…
Passenger and freight ferry “Patria Seaways”
|

Passenger and freight ferry “Patria Seaways”

Task: Control over fuel consumption at main engines 1 and 2. Solution: Installation of a differential fuel consumption control system on 2 main engines with information output to the operator panel in the CPU. Installation of a control repeater on the bridge in conjunction with a GPS module. Output of information in CSV format to…
Cruise ferry «ROMANTIKA»
| |

Cruise ferry «ROMANTIKA»

Task: Control and automated accounting of fuel consumption at 4 main engines, 3 diesel generators, 2 boilers. Monitoring of the amount of fuel pumped over the ship. Installation of a fuel additive dosing system. Monitoring of bunkering (fuel intake to the vessel). Solution in 2 steps: Stage 1. Installation of a differential fuel consumption control…